Quick Facility Assessment
Rank the following on a scale of 1 to 5; one being poor, five being excellent.
- Does it have an adequate number of parking spaces?
Formula: Number of parking spaces ____ times 2 (or the average number of people per car) times .80 (to account for fluctuations in attendance from week to week) = ____ MAXIMUM AVERAGE CAPACITY at any given time.
- Does it have adequate sanctuary seating?
Formula: Multiply the number of seats ____ (figuring 24 inches per person) times .80 (to account for fluctuations in attendance from week to week) = ____ MAXIMUM AVERAGE CAPACITY at any given time. Also, the seating capacity shouldn’t be greater than twice the worship service’s average attendance.
- Does its site have adequate land for future expansion?
Formula: Multiply the number of acres ____ times 100 = ____ MAXIMUM SITE CAPACITY.
- Is its narthex/gathering area large enough?
Formula: Multiply the sanctuary’s square footage ____ times .25 = _____ MINIMUM SIZE NEEDED.
- Is the fellowship hall’s seating capacity adequate?
Formula: Multiply worship attendance average time .50 = _____ MINIMUM SIZE NEEDED.
- Is the facilities’ classroom spaces adequate?
Formula: Multiply the number of children to be served ____ times 35 square feet for first grade and younger classrooms (20 square feet for classrooms of older ages) = _____ MINIMUM SIZE NEEDED.
- Are its restrooms large enough (ask the women), clean, and accessible?
- Is the facilities fully handicapped accessible?
- Is it air-conditioned?
- Is its nursery large enough, clean, and near the sanctuary? Does it have a bathroom?
- Will it meet state requirements for a day care or pre-school? (optional)
- Is it energy efficient and easy to maintain?
- Does it have adequate fellowship hall or large-group meeting/recreational space?
- Does it have an adequate kitchen facilities? Does it meet health codes?
- Is there adequate land available for recreational space? (optional)
- Does it have a prayer room with outside access? (optional)
Prioritize which of the above needs to be included in a building project.